
| Race Detail |
| Mid Mountain Marathon USA UT Park City Marathon September heinrichdeters@yahoo.com http://www.mountaintrails.org/2009/03/mid-mountain-marathon-september-12 Boardwalk under repair on Millennium trail between Bobsled Drive and Bear Cub Drive in the Bear Hollow area. Boardwalk will be closed intermittently. Assessment Construction: Keystone Trail will be rerouted where it crosses the Meadow road. The trail will remain open during construction. Thaynes Road trail will be closed on the west side where it crosses the Crescent Ridge Road and the Steps trail. It will be closed on the east side at the intersection of the Apex trail. Short Fuse will be closed at the Claimjumper Road and the Crescent Mine Grade. Crescent Mine Grade will be closed where is crosses Assessment run. We have built switchbacks from the Mid Mountain trail up Hidden Splendor run to the Crescent Mine Grade trail. This will enable the bike trail to stay open. Mid Mountain trail will remain open thru construction. We will be crossing the trail at some point and will reroute it around our trench. Three Kings Construction: We plan to reroute the Silver Spur trail. We will close it at the base of the resort and send the traffic down the Skiway to the bottom of Eagle lift and up the truck road to the existing trail. The Assessment job should take us 4 weeks to complete. The Three Kings will take 8 weeks to complete. All of the closing will be done with T-posts and fence. Any reroutes will marked with detour signs. |
